Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/27/2010 | ENGINEERING PRE-CONSTRUCTION | Approved | RECEIVED BASIN CERTIFICATION LETTER. FILE READY TO CLOSE OUT. | |
| 04/14/2009 | ENGINEERING PRE-CONSTRUCTION | Approved | Contractor provided information and installed controls. | |
| 04/10/2009 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | ON-SITE MEETING WITH KERRY 240-6158 COLLINS EXCAVATING 1. REVIEW AND COMPLETE PRE-CON DOCUMENT AND RETURN A COPY TO THE INSPECTOR AT THE FOLLOW-UP INSPECTION. 2. REVIEW AND FILL IN THE BLANKS IN THE SWPPP. 3. INSTALL SEDIMENT AND EROSION CONTROLS. 4. POST THE AZPDES AUTHORIZATION AT THE SITE ENTRANCE. 5. CALL IN FOLLOW-UP PRECONSTRUCTION INSPECTION AND INSTALLTION OF CONTROLS INSPECTION FOR APPROVAL PRIOR TO EARTH MOVING OPERATIONS. 6. RECOMMEND STABILIZED CONSTRUCTION ENTRANCE (SCE) WITH ROCK. SWPPP PLAN CAN BE MODIFIED FOR ALTERNATE SCE LOCATION. CONTACT ANDY CONNER 349-3640 FOR NPPO INSPECTION MARC AVERY 240-9871 FOR FOLLOW UP PRE-CON |