Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T09BU00007
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/30/2010 | GRADING - INTERMEDIATE | Approved | ||
08/20/2010 | GRADING - INTERMEDIATE | Continued | CONTRACTOR WILL LOOSE TWO PARKING SPOTS SHOWN ON THE APPROVED PLAN IN ORDER TO MEET THE THREE FOOT SET BACK BETWEEN THE PERIMETER WALL AND THE CURB - THE SITE WILL STILL MEET THE MINIMUM REQUIREMENT FOR PARKING. CONTRACTOR MUST ENSURE THE SLOPE BELOW THE WALL IS PROPERLY PROTECTED FROM EROSION. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
07/21/2010 | GRADING - INTERMEDIATE | Continued | MET WITH SUPINTENDENT AND DISCUSSED THE RELEASE OF BLDG'S # 3 AND 4 ON SITE. CONSTRUCTION WILL BE COMPLETED NEXT WEEK AND LANDSCAPING SHOULD ALSO BE DONE. SOME SITE WORK REMAINS TO INCLUDE INSTALLATION OF A SWALE AROUND THE NW SIDE OF BLDG#3 AND THE INSTALLATION OF ROCK. CONTRACTOR MUST ENSURE ANY REMAINING CONSTRUCTION ON SITE IS PHYSICALLY SEPARATED FROM PUBLIC ACCESS AND OCCUPANCY. |
|
06/11/2010 | GRADING - INTERMEDIATE | Continued | CONTRACTOR STILL WORKING ON BLDGS FOR PHASE TWO OF PROJECT. NO SITE WORK HAS BEEN COMPLETED FOR PHASE TWO. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
03/30/2010 | GRADING - INTERMEDIATE | Continued | DEMO WORK ON SECOND PHASE OF PROJECT. 1 OF 4 BLDGS HAS BEEN TOTALLY DEMOLISHED, OTHER 3 BEING REFURBISHED. NO SITE WORK BEING DONE AT THIS TIME. NO STORM WATER CONCERNS AT THIS TIME. | |
02/11/2010 | GRADING - INTERMEDIATE | Continued | PRELIMINARY INSPECTION FOR A RELEASE OF PART OF THE PROPERTY FOR OCCUPANCY, ENSURE REMAINING CONSTRUCTION AND PUBLIC ARE SEPARATED | |
02/10/2010 | GRADING - INTERMEDIATE | Continued | PRIOR TO APPROVAL FROM ENGINEERING FOR A PARTIAL CERTIFICATE OF OCCUPANCY, ENSURE ANY REMAINING CONSTRUCTION IS PHYSICALLY SEPARATED FROM PUBLIC ACCESS AND THE OCCUPIED BLDGS UNTIL ALL WORK IS COMPLETED. CONTRACTOR CHANGED THE CONCRETE VALLEY GUTTER OUTLET DIRECTION ALONG THE NE CORNER OF SITE - MUST PROVIDE STAMPED DRAWING SHOWING CHANGES MADE. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |
|
01/08/2010 | GRADING - INTERMEDIATE | Continued | MODIFICATIONS NEEDED TO CURB AND GUTTER DUE TO POWER POLE AND TIE DOWN - SE CORNER OF SITE. NO STORM WATER CONCERNS |
|
12/28/2009 | GRADING - INTERMEDIATE | Continued | CONTRACTOR AND OWNER MAY WANT TO CHANGE HC PARKING LOCATION (WOULD REQ REVIEW FROM ZONING) DUE TO ELEVATION CHANGES TO BLDG FOUNDATION. NO STORM WATER CONCERNS AT THIS TIME |
|
12/10/2009 | GRADING - INTERMEDIATE | Continued | MET W/ CONTRACTOR TO DISCUSS THE ADDITION OF MULITIPLE SCUPPERS TO SIDEWALKS AT AREAS OF DRAINAGE NEAR ROOF DRAINS - NO CONCERNS W/ CHANGES NEED STATEMENT FROM EOR NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
12/02/2009 | GRADING - INTERMEDIATE | Continued | TOFFEL CONSTR, PEIRCE - 602-320-7427 AND GEORGE 623-203-2991 PROVIDE A DETAILED PHASING (TEMP) PLAN FOR TRANSFERRING CURRENT OCCUPANTS FROM EXISTING BLDGS TO NEWLY RENOVATED BLDGS SHOWING SAFE ACCESS, PARKING, TRASH SERVICE, AND DRAINAGE. ENSURE A PHYSICAL SEPARATION FROM CONSTRUCTION REMAINING AND THE PUBLIC. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |
|
08/19/2009 | GRADING - INTERMEDIATE | Continued | PRE-CON ACCOMPLISHED. MET WITH CONTRACTOR, REVIEWED APPROVED SITE/GRADING PLAN. SOME DESCREPENCIES EXIST DUE TO LACK OF ROOM ( PAAL WIDTH...) ON SITE. CONTRACTOR WIL COMPPLETE HALF THE SITE, THEN MOVE EXISTING OCCUPANT TO REMODLED SIDE AND COMPLETE THE SECOND HALF. 1) ALL CONSTRUCTION MUST BE SEPARATED FROM THE PUBLIC. 2) NO REQUIREMENT FOR SWPPP, HOWEVER TRACKING OF SOIL MUST BE SWEPT ROUTINELY AND ANY EXISTING STORM SEWER INLETS MUST BE PROTECTED. 3) CALL FOR INSPECTION FOR ANY CHANGES MADE TO THE APPROVED PLAN. |