Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T09BU00007
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/30/2010 | STORMWATER FOLLOW-UP INSP | Approved | ||
08/20/2010 | STORMWATER FOLLOW-UP INSP | Continued | CONTRACTOR WILL LOOSE TWO PARKING SPOTS SHOWN ON THE APPROVED PLAN IN ORDER TO MEET THE THREE FOOT SET BACK BETWEEN THE PERIMETER WALL AND THE CURB - THE SITE WILL STILL MEET THE MINIMUM REQUIREMENT FOR PARKING. CONTRACTOR MUST ENSURE THE SLOPE BELOW THE WALL IS PROPERLY PROTECTED FROM EROSION. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
06/11/2010 | STORMWATER FOLLOW-UP INSP | Continued | CONTRACTOR STILL WORKING ON BLDGS FOR PHASE TWO OF PROJECT. NO SITE WORK HAS BEEN COMPLETED FOR PHASE TWO. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
03/30/2010 | STORMWATER FOLLOW-UP INSP | Continued | DEMO WORK ON SECOND PHASE OF PROJECT. 1 OF 4 BLDGS HAS BEEN TOTALLY DEMOLISHED, OTHER 3 BEING REFURBISHED. NO SITE WORK BEING DONE AT THIS TIME. NO STORM WATER CONCERNS AT THIS TIME. | |
03/17/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO STORM WATER CONCERNS AT THIS TIME | |
02/10/2010 | STORMWATER FOLLOW-UP INSP | Continued | PRIOR TO APPROVAL FROM ENGINEERING FOR A PARTIAL CERTIFICATE OF OCCUPANCY, ENSURE ANY REMAINING CONSTRUCTION IS PHYSICALLY SEPARATED FROM PUBLIC ACCESS AND THE OCCUPIED BLDGS UNTIL ALL WORK IS COMPLETED. CONTRACTOR CHANGED THE CONCRETE VALLEY GUTTER OUTLET DIRECTION ALONG THE NE CORNER OF SITE - MUST PROVIDE STAMPED DRAWING SHOWING CHANGES MADE. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |
|
01/08/2010 | STORMWATER FOLLOW-UP INSP | Continued | MODIFICATIONS NEEDED TO CURB AND GUTTER DUE TO POWER POLE AND TIE DOWN - SE CORNER OF SITE. NO STORM WATER CONCERNS |
|
12/28/2009 | STORMWATER FOLLOW-UP INSP | Continued | CONTRACTOR AND OWNER MAY WANT TO CHANGE HC PARKING LOCATION (WOULD REQ REVIEW FROM ZONING) DUE TO ELEVATION CHANGES TO BLDG FOUNDATION. NO STORM WATER CONCERNS AT THIS TIME |
|
12/10/2009 | STORMWATER FOLLOW-UP INSP | Continued | MET W/ CONTRACTOR TO DISCUSS THE ADDITION OF MULITIPLE SCUPPERS TO SIDEWALKS AT AREAS OF DRAINAGE NEAR ROOF DRAINS - NO CONCERNS W/ CHANGES NEED STATEMENT FROM EOR NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
12/02/2009 | STORMWATER FOLLOW-UP INSP | Continued | TOFFEL CONSTR, PEIRCE - 602-320-7427 AND GEORGE 623-203-2991 PROVIDE A DETAILED PHASING (TEMP) PLAN FOR TRANSFERRING CURRENT OCCUPANTS FROM EXISTING BLDGS TO NEWLY RENOVATED BLDGS SHOWING SAFE ACCESS, PARKING, TRASH SERVICE, AND DRAINAGE. ENSURE A PHYSICAL SEPARATION FROM CONSTRUCTION REMAINING AND THE PUBLIC. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |
|
11/18/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SITE WORK HAS BEEN COMPLETED. WORK WILL BE PHASED. GRADING PERMIT WILL NOT BE APPROVED UNTIL ALL SITE WORK IS COMPLETED. NO STORM WATER CONCERNS AT THIS TIME |
|
11/06/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |