Inspection History Details
Inspection Status: Passed
Inspection History: COT - BASN - Drainage/Basin - Condition Inspection
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2009 | COT - BASN - Drainage/Basin - Condition Inspection | Passed | received inspection maintenance contract from Rick Engineering |