Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/30/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE A PERMANENT SOURCE OF COMBUSTION AIR FOR WATER HEATER AND DRYER ROOM MEETING BTU REQUIREMENT OF DEVICES 2) GAS CARD AT METER |
|
| 12/24/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. ALL TOOL MARKS AND FITTING UNDERGROUND TO 6" ABOVE GRADE TO BE PRIMED THEN TAPED TO ACHIEVE 40MIL. THICKNESS OF PIPE WRAP ON STEEL PIPE & FITTINGS. 2. WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN PIPING TO BE RIDGID APPROVED MATERIAL (NO FLEX PIPING) GRAVITY DRAIN TO DAYLIGHT TERMINATING AT 90 DEG. DOWN 6" TO 24" FROM FINISH GRADE. 3. PROVIDE BONDING OF BUILDING GAS PIPING 4. SEAL GAS PIPE ENTRY INTO BUILDING FOR STOVE SUPPLY 5. SECURE GAS PIPING IN WALL FOR STOVE SUPPLY AT TRANSITION LOCATION FROM STEEL TO CSST. 6. PROVIDE CORRECT COMBUSTION AIR FOR WATER HEATER, DRYER AREA 7. PROVIDE CORRECT BTU RATED FLEXES FOR ALL APPLIANCES ON SITE. |