Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/24/2008 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 12/23/2008 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 12/22/2008 | PLUMBING - GAS PRESSURE TEST | Cancelled | ||
| 12/22/2008 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 12/19/2008 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. TEST TO BE IN PLACE WITH TEST GAUGE IN 1/10 POUND INCREMENTS HOLDING TEST FOR MINIMUM 15 MINUTES WITH 10 PSI TEST IN ENTIRE GAS SYSTEM. 2. PROVIDE APPROVED COUPLINGS FOR CONNECTION (THREAD PROTECTORS ARE NOT APPROVED) FOR PIPING 3. AFTER TEST IS HOLDING PRIME THEN TAPE ALL UNDERGROUND TOOL MARKS AND FITTINGS 4. PROVIDE AGA OR CSA APPROVED GAS VALVE AT BUILDING SERVICE ENTRY TEST WITH THIS VALVE IN OPEN POSITION 5. PROVIDE APPROVED (CSA OR AGA) GAS SHUT OFF VALVE AT WATER HEATER. 6. PROVIDE A DRAFT HOOD FOR WATER HEATER, MAKE VENT FOR WATER HEATER UP CORRECTLY TO DRAFT HOOD PROVIDE APPROVED FASTENERS AT VENT JOINTS, THIS VENT IS REQUIRED TO RUN IN AN UPWARD DIRECTION TO POINT OF TERMINATION 7. PROVIDE CORRECT VENTING FOR FURNACE. NOTE: SINGLE WALL SHALL GO TO SINGLE WALL VENTING 8. WATER HEATER TEMPERATURE & PRESSURE RELIEF SHALL GRAVITY DRAIN TO DAYLIGHT (CANNOT BE TRAPPED) 9. PROVIDE BONDING OF BUILDING GAS PIPING. |