Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 01/30/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 01/13/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN SHALL GRAVITY DRAIN TO DAYLIGHT WITH APPROVED MATERIAL (GALV, CPVC, COPPER) TERMINATING AT 90 DEG. DOWN 6"-24" FROM FINISH GRADE OR BE INSTALLED WITH PETITION OF APPEAL FROM 201 N. STONE FOR ALTERNATE FORM OF TEMPERATURE AND PRESSURE RELIEF SIGNED BY CITY AND ON SITE. |