Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/24/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 10LB. TEST IS OK LEFT GAS CARD |
|
| 12/22/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* YOUR TEST GAUGE IS BROKEN AND PIPING SHALL BE RIDGID INTO WATER HEATER ENCLOSURE. WITH APPROVED VALVE. |
|
| 12/15/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* THERE IS A NEW WATER HEATER & FURNACE INSTALLED WITHOUT PERMITS. 1. PROVIDE MINIMUM 10 PSI TEST ON ENTIRE GAS SYSTEM WITH TEST GAUGE IN 1/10 POUND INCREMENTS TO HOLD FOR MINIMUM 15 MINUTES WITH NO LOSS OF PRESSURE AT TIME OF INSPECTION 2. PROVIDE APPROVED GAS SHUT OFF VALVES AT ALL APPLIANCES 3. PROVIDE RIDGID NIPPLE THRU FURNACE APPLIANCE HOUSING. 4. PROVIDE WEATHERPROOF ENCLOSURE FOR NEW WATER HEATER 5. PROVIDE TEMPERATURE & PRESSURE RELIEF DRAIN PIPE (COPPER OR CPVC PLASTIC OR GALVANIZED FULL SIZE 3/4" PIPE TERMINATING DOWN 6" TO 24" FROM FINISH GRADE. 6. SEAL THE COMBUSTION AIR OPENING IN THE DOOR OF FURNACE CLOSET 7. PROVIDE AIR TIGHT SEAL AROUND RETURN AIR INTAKE TO FURNACE 8. REMOVE TAPE AT SINGLE TO DOUBLE WALL VENT CONNECTION OF FURNACE. |