Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/24/2009 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 02/18/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. PVC IS NOT APPROVED MATERIAL FOR T&P RELIEF DRAIN (YOU MAY USE CPVC) 2. IF WATER HEATER VENT IS WITHIN 10 FEET OF EVAP. COOLER IT IS TO EXTEND TWO FEET ABOVE COOLER 3. FEMALE PLASTIC THREADS NOT APPROVED WITH MALE METALLIC THREADS |
|
| 02/11/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE ROOF JACK FOR GAS PIPING THRU ROOF ON WEST SIDE WATER HEATER 2. PROVIDE 1" CLEAR AROUND AND APPROVED FLUE VENT AND CAPS FOR EAST AND WEST SIDE WATER HEATERS 3. RUN T&P DOWN 6" TO 24" FROM GROUND 4. PROVIDE NEW PRESSURE TEST 5. EXTEND 2' ABOVE FURNACE |