Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS RECONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/28/2008 | PLUMBING - GAS RECONNECT | Approved | ||
| 11/25/2008 | PLUMBING - GAS RECONNECT | Not ready for Inspection | IVRS - Inspection :* 1. TEST TO HOLD WITH NO LOSS OF PRESSURE. 2. PLEASE READ AND COMPLY WITH ALL NOTES LEFT ON 11/24/08 3. NOTE: YOUR WATER HEATER VENT IS NOT CORRECT, IF YOU CHOOSE TO USE DOUBLE WALL VENT IT MUST CONTINUE AS DOUBLE WALL VENT PIPING TO THE POINT OF TERMINATION WITH THE APPROVED VENT CAP. |
|
| 11/24/2008 | PLUMBING - GAS RECONNECT | Not ready for Inspection | IVRS - Inspection :* 1. REQUIRE A 10-POUND TEST AT TIME OF INSPECTION 2. NO THREADS AT T&P RELIEF DRAIN OUTLET. FULLSIZE USE APPROVED VALVES SINGLE WALL MAY NOT PASS THRU CEILING WRAP 90 DEG. WITH 10MIL TAPE AND TAPE PRIMER |