Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* GAS CARD AT METER |
|
| 11/19/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* THIS IS A REPIPE 1. PROVIDE FULL SIZE SCOTCH COATED PIPING AT BOTH RISER LOCATIONS 2. PRIME THEN TAPE ALL TOOL MARKS AND FITTINGS TO 6" ABOVE GROUND TO ACHIEVE 40 MIL THICKNESS ON PIPE WRAP 3. PROVIDE AN APPROVED BUILDING SHUT OFF VALVE AT ENTRY TO BUILDING ON GAS PIPING 4. PROVIDE CORRECT VENT PIPING AT WATER HEATER REMOVE ALL TAPE & PROVIDE FASTENERS FOR VENT JOINTS 5. REINSTALL BONDING CLAMP AT WATER HEATER GAS PIPING 6. PROVIDE SEDIMENT TRAPS AT GAS ENTRY TO FURNACE AND WATER HEATER 7. PROVIDE CORRECT SIZE FLEX TO FURNACE FOR 100,000 BTU DEMAND |