Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/10/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/01/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. IMPROPER VENTING 2. IMPROPER T&P TERMINATION 3. PROVIDE ELECTRICAL BONDING 4. NO APPROVED GAS CONNECTOR ON SITE FOR WH 5. OWNER WAS ARGUMENTATIVE, HOSTILE AND THREATENED LEGAL ACTION |
|
| 05/08/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* CAP UNUSED PIPING (OR SEAL) PSI AT 5 UPON ARRIVAL 10 PSI REQUIRED REMOVE FUTURE TEE CONN. OR SHOW IT ON PLAN PROVIDE APPROVED PIPE SUPPORTS INSTALL SEDIMENT TRAPS 1211.7.3 CORRECT WH SUPPORTING STRUCTURE AND VENTING (WATER HEATER INSTALLED W/OUT PERMIT) TYPE B VENT SHALL ORIGINATE WITHIN ROOM DRAFT COLLAR REQUIRED SEE UPC SECTIONS (2006) 510.3.1, 510.4.1, 502.9 AND 101.6 ALSO, 101.4 AND 503, 102.3.2 NOTE: HOME OWNER THREATENED LEGAL ACTION! |
|
| 05/01/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 9:35 NO ACCESS PLEASE HAVE A TEST ON YOUR ENTIRE GAS SYSTEM AND AN ADULT PRESENT TO PROVIDE ACCESS TO ENTIRE GAS SYSTEM AT REINSPECTION. THIS IS NOT A COMPLETE LIST. |