Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T08PL01581

Parcel: 131052130


Addresses:

5402 E 30TH ST 0A


Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Permit Number - T08PL01581

Inspection Description - PLUMBING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
11/04/2008 PLUMBING - FINAL Approved IVRS - Inspection :*
SEE NOTE #3 THIS SHEET, IN THE FUTURE FAILURE TO COMPLY WITH ALL CORRECTIONS WILL RESULT IN REINSPECTION FEES

REINSPECTION APPROVED
10/31/2008 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. TEST TO BE ON ENTIRE GAS PIPING SYSTEM
2. PIPE PRIMER IS TO BE APPLIED TO PIPE THEN PIPE WRAP IS TO BE APPLIED IN 1/2 OVERLAP, DOUBLE WRAPPED TO ACHIEVE 40 MIL. THICKNESS ON ALL FITTINGS & TOOL MARK BELOW GRADE.
3. VENT FROM WATER HEATER TO BE INSTALLED CORRECTLY WITH APPROVED MATERIAL, WITH APPROVED FASTENERS AT EACH JOINT.
4. SUPPORT GAS PIPING AT FURNACE
5. PROVIDE SEDIMENT TRAP AT FURNACE
6. PROVIDE FASTENERS AT FURNACE VENT PIPING AT EACH JOINT (NO TAPE)
7. VENTS FROM APPLIANCES WITHIN 10' OF COOLER ARE REQUIRED TO BE 3' ABOVE TOP OF COOLER INTAKE WITH APPROVED VENT MATERIAL AND CAP
8. GAS PIPING IS TO GO DIRECTLY ONTO PROPERTY CANNOT BE IN RIGHT OF WAY AND SHALL BE ON A FIRM BED
9. PROVIDE CORRECT COMBUSTION AIR TO APPLIANCES.