Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/25/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/19/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* GAS CARD AT METER SEE NOTE #6 & CONTINUE DOUBLE WALL TO CAP ON WATER HEATER AND EXTEND FURNACE VENT UP WITH DOUBLE WALL VENT PIPING PER NOTE #6 ABOVE. |
|
| 10/29/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE APPROVED COUPLING ON UNDERGROUND PIPING 2. TEST TO BE IN PLACE MINIMUM 10 PSI FOR 15 MINUTES WITH NO LOSS OF PRESSURE AT TIME OF INSPECTION GAUGE 1/10 POUND INCREMENTS 3. PRIME THEN TAPE ALL FITTINGS & TOOL MARKS ON ALL BELOW GROUND PIPING. DOUBLE WRAP TAPE TO ACHIEVE 40 MIL. THICKNESS 4. VENT FROM WATER HEATER TO BE MADE UP CORRECTLY AND JOINTS TO BE SECURED WITH GALV SCREWS 5. T&P REQUIRES DRAIN PIPING 6. PROVIDE DOUBLE WALL VENT PIPING THRU CEILING ROOF STRUCTURE TO 3' ABOVE TOP OF COOLER WHEN WITHIN TEN FEET OF COOLER INTAKE WITH APPROVED CAP FOR BOTH WATER HEATER & FURNACE 7. PROVIDE APPROVED GAS SHUT OFF VALVES AT FURNACE AND WATER HEATER 8. PROVIDE GASKETED SELF-CLOSING DOOR TO WATER HEATER |