Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/03/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/30/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* PETITION OF APPEAL #508-08 ON SITE 1. PROVIDE NIPPLE WITH NO THREADS ON DISCHARGE END AND VACUUM BREAKER ON HOSE BIB 2. DOUBLE WALL VENT PIPING NEEDS TO FIT TOGETHER PROPERLY (LIKE FOR LIKE MATERIAL) AND HAVE ABILITY TO KEEP RAIN OUT OF STRUCTURE. |
|
| 10/28/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. WATER HEATER TEMPERATURE & PRESSURE RELIEF SHALL GRAVITY DRAIN TO DAYLIGHT OR PROVIDE CITY SIGNED PETITION OF APPEAL FOR ALTERNATE FORM OF T&P RELIEF INSTALLED CORRECTLY ON SITE 2. REMOVE TAPE FROM ALL JOINTS OF VENT PIPING WATER HEATER/FURNACE AND PROVIDE APPROVED FASTENERS AT ALL JOINTS. 3. VENT FROM WATER HEATER/FURNACE SHALL TERMINATE WITH FULL SIZE DOUBLE WALL VENT PIPING 3' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE 4. PROVIDE BONDING OF BUILDING GAS PIPING |