Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
Permit Number - T08PL01528
Inspection Description - PLUMBING - FINAL
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/22/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. TEST TO HOLD WITH NO LOSS OF PRESSURE ON ENTIRE GAS SYSTEM 2. SCOTCH-COATED, PRIMED THEN TAPED PIPING AND FITTINGS IS REQUIRED FOR STEEL PIPING UNDERGROUND. 3. WATER HEATER TEMPERATURE & PRESSURE RELIEF IS REQUIRED TO GRAVITY DRAIN TO DAYLIGHT WITH APPROVED MATERIAL TERMINATING 6" TO 24" AT 90 DEG. DOWN (CPVC) 4. PROVIDE APPROVED GAS SHUTOFF VALVES AT ALL APPLIANCES AND AT BUILDING ENTRY IF METER IS IN ALLEY 5. PROVIDE DRIP LEGS AT FURNACE/WATER HEATER 6. PROVIDE BONDING OF BUILDING GAS PIPING |
|
10/20/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* CANCELED |