Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
Permit Number - T08PL01258
Inspection Description - PLUMBING - FINAL
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/27/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* PERMIT WAS ISSUED FOR "GAS RECONNECT" HOWEVER, NEW GAS PIPING WAS RAN TO THE BOILER AND ALL OF THE WASHERS AND DRYERS HAVE BEEN RE-PIPED FOR THE EXTENT OF THE REMODEL DONE, ADDITIONAL PERMITS MAY BE REQUIRED. FOR THE "GAS RECONNECT" I WILL NEED AN APPROVED GAS PLAN |
|
08/26/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* DOOR LOCKED - NO ACCESS |