Permit: T08PL01239

Parcel: 107010300

Inspection Status: Not ready for Inspection

Inspection History: PLUMBING - FINAL

Permit Number - T08PL01239

Inspection Description - PLUMBING - FINAL

Inspection Status - Not ready for Inspection

Date Description Inspector Results Comments
08/29/2008 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1. GAS SHUT OFF VALVE AT POOL HEATER TO BE INSTALLED UPSTREAM OF FLEX. PRIOR TO TURN ON.
08/27/2008 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
08/22/2008 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. PROVIDE TEST GAUGE IN 1/10 POUND INCREMENTS WITH TEST IN PLACE MINIMUM 10 PSI TO HOLD FOR 15 MINUTES WITH NO LOSS OF PRESSURE AT TIME OF NEXT INSPECTION TO ALL SYSTEM
2. PROVIDE RIDGID PIPE NIPPLE THRU POOL HEATER APPLIANCE HOUSING
3. PROVIDE FACTORY COATED PIPE (SCOTCH COAT) FOR UNDERGROUND REPAIR AND PRIME ANY EXISTING PIPE THEN TAPE ALL TOOL MARKS, FITTINGS AND EXISTING PIPE TO ACHIEVE 40 MIL. THICKNESS OF PIPE WRAP
4. WATER HEATER TEMPERATURE AND PRESSURE RELIEF DRAIN SHALL BE FULL SIZE APPROVED PIPING GRAVITY DRAIN TO DAYLIGHT TERMINATING AT 90 DEG. DOWN 6" TO 24" FROM FINISH GRADE
5. PROVIDE BONDING OF BUILDING GAS PIPING
6. VENT FROM WATER HEATER TO BE ATTACHED CORRECTLY TO DRAFT HOOD TO ELIMINATE CARBON MONOXIDE IN WATER HEATER CLOSET
7. NEED ACCESS TO ROOF OF LAUNDRY ROOM FOR WATER HEATER VENT TERMINATION.

LIST MAY NOT BE COMPLETE

8. MAKE WATER HEATER GAS VALVE ACCESSIBLE