Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2008 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 08/15/2008 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PIPING IS COVERED WITHOUT INSPECTION, EXPOSE ALL PIPING, GOOD SHADING AND BACKFILLING MATERIAL IS REQUIRED AT TIME OF INSPECTION - OK FOR BACKFILLING LARGE ROCKS CANNOT BE IN CONTACT WITH P.E PIPING 2. PROVIDE CORRECT VENTING OF WATER HEATER, IF YOU GO DOUBLE WALL VENT PIPING TO CONTINUE DOUBLE WALL TO POINT OF TERMINATION. PROVIDE CORRECT VENT FITTING WITH CORRECT FASTENERS AT EACH JOINT (REMOVE ALL TAPE) 3. FURNACE VENT MUST TRAVEL IN UPWARD DIRECTION TO POINT OF TERMINATION 4. PROVIDE BONDING OF BUILDING GAS PIPING |