Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T08PL01193

Parcel: 141353690

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Permit Number - T08PL01193

Inspection Description - PLUMBING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
10/17/2008 PLUMBING - FINAL Approved IVRS - Inspection :*
10/15/2008 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
THE OVERFLOW DRAIN PIPING MUST GRADUALLY RUN DOWN HILL FROM THE OPENING IN THE TANK THRU THE HOLE IN THE WALL BE FASTENED TO THE WALL AND HAVE MINIMUM 1" CLEARANCE FROM END OF PIPING AND THE GROUND ON THE EXTERIOR.
08/28/2008 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
OVERFLOW DRAIN SHALL GRAVITY DRAIN TO AN AREA ON THE PROPERTY WHERE IT CAN BE ABSORBED WITH AIR GAP AND APPROVED DRAIN MATERIAL.