Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/05/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/17/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PRESSURE HOLDING @ 10.2 PSI 2. FOR GAS CLEARANCE, PROVIDE ACCESS TO INSPECT ALL GAS APPLIANCES AND PIPING 3. NEW WATER HEATER REQUIRES A PERMIT, ADD 4. B VENT REQUIRED OUTSIDE OF ENCLOSURE 5. TAPE NOT PERMITTED AT CONNECTION TO B-VENT 6. ARMA FLEX INSULATION REQUIRES THE USE OF CONTACT CEMENT 7. PROVIDE ELECTRICAL BONDING OF GAS SYSTEM SEAL OPEN SEWER PIPE AT WH LOCATION |