Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/28/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* GAS CARD AT METER PROVIDE BONDING PER NOTE #4 7/8/08 INSP. |
|
| 07/08/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE TEST GAUGE IN 1/10TH POUND INCREMENTS AND TEST PRESSURE OF MINIMUM 10PSI ON GAS ENTIRE GAS SYSTEM AT TIME OF INSPECTION 2. PROVIDE AGA OR CSA APPROVED GAS VALVES AT ALL APPLIANCES WITH TEST UP TO THESE VALVES AT TIME OF INSPECTION 3. PROVIDE BONDING OF BUILDING GAS SYSTEM 4. VENT FROM WATER HEATER/FURNACE TO HAVE 3-APPROVED FASTENERS AT EACH JOINT BE DOUBLE WALL VENT PIPING (FULL SIZED) THRU CEILING AND ROOF TERMINATING 3' ABOVE TOP OF COOLER INTAKE WITH APPROVED DOUBLE WALL VENT CAP |