Inspection History Details
Inspection Status: Approved
Inspection History: SITE - SEWER
Permit Number - T08PL01004
Inspection Description - SITE - SEWER
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2009 | SITE - SEWER | Approved | ||
06/17/2009 | SITE - SEWER | Partial Approval | IVRS - Inspection :* | |
06/15/2009 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* INTERCEPTOR TO BE INSPECTED BY LEERAY HANLY |
|
06/12/2009 | SITE - SEWER | Partial Approval | INSPECTED VENT (35' +/-) 2" PVC UNDERGROUND, DUCTILE ABOVE; OIL/WATER SEPARATOR & 4" HCS TO SEPARATOR NORTH OF TIRE WASH (BLD 7). TEST OK, OK TO COVER. | |
11/18/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* ALL TESTING ON SEWER DONE TODAY |
|
11/17/2008 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* | |
11/13/2008 | SITE - SEWER | Partial Approval | ||
11/12/2008 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR TO PIECE TOGETHER ALL DATA PERTAINING TO ALL WORK PERFORMED ON PRIVATE SEWER AFTER 09/08/08 AND CONVINCE INSPECTOR OF COMPLIANCE |
|
09/08/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* BASES SET FOR MH #12, 13, 14 AND 9 |
|
09/03/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* NO NEW WORK TODAY CALL 03057 AND LEAVE MESSAGE FOR BASES AND MANHOLES |
|
09/02/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* BACKFILLING BETWEEN MH #13 AND MH #9 |
|
08/29/2008 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* | |
08/26/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* PRE-CON MEETING WITH F.W.W.D FOR SITE WATER DISTRIBUTION - NO NEW SEWER INSTALLED |
|
08/25/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 8" SDR 35 FROM MH.#13 TO MH.#14 OK TO COVER SUBJECT TO VERIFICATION OF GRADE AND TEST AT A LATER DATE |
|
08/22/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* JENSEN PRE-CAST SETTING MANHOLE's TODAY |
|
08/21/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* FROM MH #13 EAST TO CLEANOUT WEST PLUS OR MINUS 50' OK TO COVER SUBJECT TO VERIFICATION OF GRADE AND TEST AT A LATER DATE |
|
08/20/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1. BASES SET #3, #4, #5, #11 2. PIPE LAYED BETWEEN #11 & #12 W/TRACER 3. DIGGING FOR OIL/WATER SEPARATOR JUST BEFORE TIE IN AT EXISTING MANHOLE 4. PLUS OR MINUS 80' PAST M.H #12 |
|
08/20/2008 | SITE - SEWER | Partial Approval | FROM MH #13 WEST TO BLDG. SERVICE AT 4000 N SUN TRAN FROM MH #13 EAST 100' OF TRENCH |
|
08/15/2008 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* | |
08/13/2008 | SITE - SEWER | Partial Approval | CONTRACTOR STARTING TO DIG | |
08/12/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1. PIPING EXTENDED TO M.H #4 WITH ONE BRANCH OK TO COVER 2. 8" SDR 35 FROM MH#4 TO MH#5 INSTALLED OK WITH ONE LATERAL BRANCH. 3. CONTRACTOR TO INSURE TRACER BEING INSTALLED 4. D.I.P INSTALLED OK 5. OK TO COVER SUBJECT TO VERIFICATION OF GRADE AND A TEST AT A LATER DATE |
|
07/30/2008 | SITE - SEWER | Partial Approval | NO NEW WORK PERFORMED | |
07/25/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* - D.I.P INSTALLED TO MH #3 -- NEEDS TO BE WRAPPED - 6" SDR 35 X 30 FEET INSTALLED BRANCH - 8" SDR 35 FROM MANHOLE #3 TO MANHOLE #4 PLUS OR MINUS 200' - OK TO COVER SUBJECT TO VERIFICATION OF GRADE AND TEST AT A LATER DATE |
|
07/24/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* FROM EXISTING MANHOLE NORTH TO TWENTY FEET SHORT OF MANHOLE NUMBER THREE. 8" SDR 35 WITH TRACER INSTALLED OK. SUBJECT TO VERIFICATION OF GRADE AND TEST AT A LATER DATE. OK TO COVER. |