Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/20/2008 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1. SECURE TUBING AT SHWR AND CORRECT LENGTH TO AVOID STRESS ON TUBING, PROVIDE ISOLATORS WHERE PASSING THRU STUDS 2. CORRECT LEAKS UNDER SINK. INSTALL HAMMER ARRESTOR AT DW 3. PROVIDE 18" OF METALLIC PIPING BEFORE TRANSITIONING TO PEX AT WH 4. SECURE TUBING AT LAVS IN MASTER 5. SECURE TUBING IN ATTIC PER MANUFACTURES INSTALLATION REQUIREMENTS 6. KEEP TUBING AWAY FROM ROOF SHEATHING 7. PROVIDE VAC BREAKER AT GARAGE HB 8. REMOVE EXCESS SOLDIER W/DAMP RAG 9. REAM ALL JOINTS! |