Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2008 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 06/16/2008 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE FULL SIZE PIPING PER PLAN, YOU CANNOT INSTALL REDUCERS UPSTREAM OF TEES AND AT METER SERVICE AREA 2. RESEAL WATER HEATER VENT THRU ROOF 3. WATER HEATER REQUIRES CORRECT COMBUSTION AIR, DRAFT HOOD AND A PERMIT IF REPLACED FOR THIS INSPECTION. REMOVE TAPE AND PROVIDE APPROVED FASTENERS AT ALL VENT PIPING JOINTS. EXTERIOR WATER HEATER 4. PROVIDE BONDING OF BUILDING GAS PIPING 5. REMOVE TAPE FROM FURNACE/WATER HEATER VENT PIPING PROVIDE APPROVED FASTENERS AT ALL JOINTS, SINGLE TO DOUBLE WALL CONNECTION TO BE MADE UP CORRECTLY WITH MINIMUM 1" CLEARANCE FROM COMBUSTIBLES AT ROOF LEVEL, TERMINATING WITH APPROVED DOUBLE WALL VENT PIPING 3' MINIMUM ABOVE COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE WITH APPROVED VENT CAP 6. PROVIDE UPPER COMBUSTION AIR INTAKE FOR FURNACE/WATER HEATER 7. UNDERGROUND PIPING TO HAVE 12" MINIMUM COVER, BE ON FIRM BEDDING AND HAVE PRIMER THEN TAPE TO ACHIEVE 40 MIL THICKNESS AT ALL TOOL MARKS & FITTINGS 8. PROVIDE EMERGENCY GAS SHUT OFF VALVE AT BUILDING LIST NOT COMPLETE |