Inspection History Details
Inspection Status: Approved
Inspection History: SEWER - PRE CONSTRUCTION MTG
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2008 | SEWER - PRE CONSTRUCTION MTG | Approved | IVRS - Inspection :* | |
| 07/24/2008 | SEWER - PRE CONSTRUCTION MTG | Not ready for Inspection | IVRS - Inspection :* MANHOLE #2 BASE POURED, PIPING FROM MANHOLE #2 TO JUST SHORT OF MANHOLE #3 WITH 4" HCS LATERAL TO 1" FROM EXISTING NEW BUILDING DRAIN STUB BEDDING, LAYING, TRACER, SHADING |
|
| 07/23/2008 | SEWER - PRE CONSTRUCTION MTG | Not ready for Inspection | IVRS - Inspection :* 8" SDR 35 PIPING INSTALLED FROM MANHOLE #1 TO #2 MANHOLE #1 BASE POURED & STACKED, PIPING FROM MANHOLE #2 JUST BEFORE 4" HCS LATERAL. NEED TO VERIFY PRE-CON MEETING WITH C.O.T INSPECTOR AND BOB AT RICK ENGINEERING UPON RETURN. INSTALLATION TO MEET 2003 PIMA COUNTY WASTE WATER STANDARDS AND PCDEQ AUTHORIZATION TO DISCHARGE BEFORE ANY HCS CONNECTIONS TO BLD. |