Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* CORRECTIONS HAVE BEEN MADE |
|
| 06/12/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. VENT CONNECTOR DOES NOT FIT PROPERLY ONTO DRAFT DIVERTER 2. DO NOT USE TAPE TO SEAL ANY PORTION OF A VENT CONNECTOR - NOT REQUIRED TO BE SEALED 3. BRICKS PILED UP ON THE PLATFORM TO RAISE WATER HEATER IS UNACCEPTABLE 4. LOWER THE T&P RELIEF DRAIN LINE IN THE WALL AS NECESSARY TO PROPERLY ATTACH THE T&P DRAIN LINE |