Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
Permit Number - T08PL00822
Inspection Description - PLUMBING - FINAL
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/20/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* BONDING IS DIFFERENT FROM GROUNDING THE WIRE NEED TO CREATE A PATH BACK TO THE ELECTRICAL PANEL. YOU CAN ACHIEVE THIS AT THE WATER HEATER COLD WATER PIPING AND THE BLD. GAS PIPING |
|
05/19/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE BONDING OF BLD. GAS PIPING 2. EXTEND WATER HEATER VENT PIPING WITH DOUBLE WALL VENT MATERIAL TO 3' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER AND TERMINATE WITH APPROVED VENT CAP |