Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/02/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 04/28/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE PRIMER THEN TAPE ALL TOOL MARKS & FITTINGS UNDERGROUND TO 6" ABOVE FINISH GRADE PRIOR TO COVERING TO ACHIEVE 40 MIL. WRAP ON PIPING 2. PROVIDE BONDING OF BUILDING GAS PIPING SYSTEM 3. WATER HEATER T&P DRAIN TO BE SEALED EXISTING BUILDING AND TERMINATED 6" MINIMUM TO 24" MAXIMUM ABOVE FLUSH GRADE. |