Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2008 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 05/05/2008 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. VENT FROM WALL HEATER TO BE EXTENDED UP TO 3' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE WITH DOUBLE WALL VENT PIPING 2. WATER HEATER IN OUTSIDE AREA TO BE REMOVED AND IT'S TEE REMOVED FROM GAS SYSTEM IF IT IS NOT DESIRED 3. PROVIDE MINIMUM 12" COVER ON PIPING WITH NO STRAIN ON JOINTS OF PIPING 4. PROVIDE APPROVED COUPLING ON NEW PIPING 5. PROVIDE BONDING OF GAS PIPING 6. ARRANGE PIPING SO WATER HEATER CAN BE REMOVED AND SECURE PIPING AT WATER HEATER/FURNACE CLOSET 7. MAKE ROOF FLASHING WATER TIGHT 8. SUPPORT PIPING ON ROOF 9. PROVIDE FASTENERS AT JOINTS OF VENT PIPING FOR WATER HEATER/FURNACE RETEST SYSTEM |