Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit: T08PL00604

Parcel: 10711061B


Addresses:

397 E DELANO ST

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
04/18/2008 PLUMBING - FINAL Approved PLEASE ARRANGE FOR ACCESS TO METS
PRESSURE TEST OK
OK FOR GAS

SW GAS 889-1888
04/14/2008 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1. WILL REQUIRE TEN POUND TEST ON ENTIRE SYSTEM AND ACCESS TO METER
2. WILL REQUIRE TAPE AND TAPE PRIMER ON UNDERGROUND SECTION TO 6" ABOVE GRADE.
HALF OVERLAP DOUBLE WRAPPED IS REQ'D
T&P RELIEF DRAIN TO BE HARD PIPED GRAVITY DRAIN
ALL VALVES TO BE AGA OR CSA APPROVED
REQUIRE SEDIMENT TRAPS AT WATER HEATER AND FURNACE