Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/19/2008 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* RECEIVED LETTER FOR OK FOR PEX OK TYPE "M" COPPER CORRECTIONS OK CALL IN 03075 FOR CLOSET FLANGE INSPECTION PRIOR TO SETTING STOOLS |
|
| 09/11/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. HORIZONTAL CLEANOUT EXTENSION TO BE A WYE BRANCH 90 DEG. TO BE A SWEEP 2. PLAN CALLS FOR TYPE "L" COPPER 3. CLEANOUTS SHALL BE INSTALLED ABOVE THE FLOW LINE OF THE PIPE |
|
| 09/10/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. TRAP ARM MAY NOT CHANGE SIZE 2. TRAP AND TRAP ARM TO BE SAME SIZE 3. TRAP ARM MAY BE ONLY ONE PIPE SIZE LARGER THAN THE TAILPIECE TO WHICH IS CONNECTED 4. POINT OF VENT MAY NOT BE BELOW TRAP WEIR 5. PROTECT ABS FROM METAL STUDS 6. CORRECT BACKPITCHED SECTIONS 7. TRAP ARM MAY ONLY CHANGE DIRECTION 90 DEG. WITHOUT ANOTHER CLEANOUT |
|
| 09/05/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE CORRECT LONG RADIUS DRAINAGE FITTINGS PER HORIZONTAL X HORIZONTAL CHANGE OF DIRECTION 2. PROVIDE TESTING ON ALL PIPING 3. PROVIDE MID-SPAN SUPPORTS AND SUPPORT ALL PIPING AT CORRECT INTERVALS IN WALL AND OVERHEAD 4. PROVIDE CORRECT TRANSITION COUPLINGS 5. PROVIDE MINIMUM FALL ON ALL DRAINAGE PIPING 6. PROVIDE CORRECT DRAINAGE FITTING FOR DRAINAGE IN RESTROOM K & L FOR STOOLS (SANITARY CROSS IS NOT) 7. PROVIDE APPROVED PERM. CAPS LIST NOT COMPLETE |
|
| 08/29/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* CANCELED |