Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/26/2009 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 01/22/2009 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. TEST TO BE ON ENTIRE GAS PIPING SYSTEM, WITH APPROVED GAS SHUT OFF VALVE AT SERVICE ENTRY TO STRUCTURE 2. PROVIDE RIDGID NIPPLE THRU ENCLOSURE OF WATER HEATER ON GAS PIPING 3. SEE NOTES FROM 4/15/08 ABOVE 4. PROVIDE AGA OR CSA APPROVED GAS SHUT OFF VALVE AT STOVE |