Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/04/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* CARD AT METER |
|
| 04/02/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE DOUBLE WALL VENT PIPING FOR WATER HEATER AND FURNACE FROM THRU ROOF TO POINT OF TERMINATION ABOVE COOLER WITH VENT CAPS 2. REMOVE TAPE AT SINGLE TO DOUBLE WALL VENT CONNECTION ON WATER HEATER VENT IN CLOSET. REMOVE ALL TAPE ON VENTING PIPING, DO NOT USE TAPE ON VENTS FROM WATER HEATER/FURNACE 3. PROVIDE AN AIR TIGHT SEAL OFF AT DOOR OF FURNACE/WATER HEATER CLOSET FROM RETURN AIR INTAKE OF FURNACE 4. PROVIDE BONDING OF BUILDING GAS PIPING |
|
| 03/25/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* DO NOT TEST THRU APPLIANCES! PROVIDE ACCESS TO THE ROOF PVC IS NOT APPROVED FOR T&P RELIEF DRAIN DRAIN NOT PERMITTED TO TERMINATE IN PAN VENT NOT APPROVED |