Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2008 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 05/29/2008 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE ROOF FLASHING AT PENETRATIONS THRU ROOF FOR PIPING 2. WATER HEATER TEMPERATURE & PRESSURE RELIEF TO BE FUNCTION FULL SIZE APPROVED MATERIAL GRAVITY DRAIN TO DAYLIGHT. TERMINATING 6"-24" WITH 90 DEG. DOWN FROM FINISH GRADE 3. PROVIDE BONDING OF BUILDING GAS PIPING 4. ALL TOOL MARKS & FITTINGS TO BE PRIMED AND THEN TAPPED TO MEET 40 MIL. THICKNESS ON PIPE WRAP FOR UNDERGROUND PIPING 5. PROVIDE APPROVED GAS SHUTOFF VALVE FOR EMERGENCY USE AT BLD. SERVICE ENTRY 6. PROVIDE 3-GALV SCREWS AT VENT CONNECTIONS FOR WATER HEATER/FURNACE |