Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2008 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 03/05/2008 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* - WATER SHALL BE ON FOR INSP. - CHECK HW/CW ORIENTATION AT WH - TUBE CLAMP MISSING ON HOT TO MASTER SHWR - SECURE TUBING ABV CEILING SO THAT IT DOES NOT TOUCH PLYWOOD ROOFING - SECURE SHOWER VALVES - PROTECT TUBING FROM ABRASION AT CONTACT W/BLOCK WALLS - PROVIDE A LADDER TO INSPECT ABOVE CEILING - BE SURE ALL TUBING IS SECURED TO PEX INSTALLATION REQUIREMENTS - REMOVE GALV NIPP. BETWEEN COPPER IN WALL AND HB AT KIT. LOCATION USE NON-FERROUS PIPING |