Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2008 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 02/27/2008 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* TEST TO HOLD 10 PSI MINIMUM WITH NO LOSS OF PRESSURE FOR 15 MINUTES 1. WATER HEATER TEMPERATURE & PRESSURE RELIEF SHALL GRAVITY DRAIN TO DAYLIGHT WITH APPROVED RIDGID 2. PROVIDE BONDING OF BUILDING GAS PIPING |