Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/03/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 02/27/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* TEST FROM METER TO APPLIANCE SHUT OFF VALVES OK UNLESS SYSTEM IS WORKED ON TO INSTALL ITEM #2 THIS PAGE THEN RETEST 1. PROVIDE RIDGID NIPPLE THRU FURNACE APPLIANCE HOUSING 2. PROVIDE SEDIMENT TRAPS AT GAS ENTRY TO WATER HEATER AND FURNACE 3. PROVIDE 3-GALV SCREWS AT ALL JOINTS OF ALL VENT PIPING FROM WATER HEATER & FURNACE 4. PROVIDE BONDING OF BUILDING GAS PIPING SYSTEM 5. PROVIDE APPROVED VENT EXTENSION ON ROOF FOR FURNACE TO 3' ABOVE TOP OF INTAKE WHEN WITHIN 10' OF INTAKE WITH APPROVED VENT CAP 6. REPLACE DAMAGED VENT PIPE ON ROOF FOR WATER HEATER AND EXTEND TO 3' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF INTAKE |