Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/05/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* AFTER HRS. CHK#252 -- $150.00 GAS CARD AT METER |
|
| 03/04/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* REMOVE ALL TAPE FROM VENT PIPING FOR WATER HEATER & FURNACE AND COMPLY WITH NOTE #5 FROM 2/25/08 INSPECTION. ALL VENT PIPING TO BE IN GOOD FUNCTIONAL CONDITION. |
|
| 02/25/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. YOUR PLAN SHOWS ONLY A WATER HEATER AND FURNACE YOU HAVE THESE AND A DRYER & STOVE. YOUR GAS SYSTEM IS UNDERSIZED 2. PROVIDE CORRECT SIZED PIPING, EXPOSE ALL EXTERIOR PIPING FOR INSPECTION 3. SUPPORT ALL INTERIOR PIPING PROPERLY 4. PROVIDE RIDGID APPROVED WATER HEATER TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING (NO FLEX) 5. PROVIDE CORRECT VENT CONNECTION FOR WATER HEATER TO FURNACE VENT WITH 3-GALV SCREWS AT ALL JOINTS WITH DRAFT HOOD INSTALLED CORRECTLY 6. TEST MUST HOLD MINIMUM 10 PSI WITH NO LOSS OF PRESSURE FOR 15 MINUTES. PROVIDE A WORKING TEST GAUGE IN 1/10TH POUND INCREMENTS 7. PROVIDE AN APPROVED GAS SHUT OFF VALVE AT EXTERIOR BUILDING ENTRY FOR EMERGENCY USE. |