Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/03/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 02/25/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* REMOVE THE TAPE MAKING CONTACT WITH THE PLASTIC P.E PIPING BEFORE COVERING. 1. PROVIDE APPROVED VENT PIPING FOR WATER HEATER AND FURNACE. LARGER DEMAND DEVICE (FURNACE) HALL VENT AS LOWER CONNECTION TO WYE FITTING WITH WATER HEATER TIE IN ABOVE. PROVIDE 3-GALV SCREWS AT EACH JOINT OF VENT CONNECTIONS. TERMINATE MINIMUM 3' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE. 2. WATER HEATER TEMPERATURE & PRESSURE RELIEF SHALL GRAVITY DRAIN WITH APPROVED RIDGID PIPING (NO FLEXES) 3. PROVIDE BONDING OF BUILDING GAS PIPING |