Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/21/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* SW GAS 889-1888 |
|
| 02/20/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. TEST TO HOLD WITH NO LOSS OR PRESSURE 2. WATER HEATER VENT TO TRAVEL IN UPHILL DIRECTION TO POINT OF TERMINATION AND BE SCREWED TOGETHER AT JOINTS. 3. WATER HEATER TEMPERATURE & PRESSURE RELIEF TO GRAVITY DRAIN TO DAYLIGHT. GO DOWN HILL. 4. WATER HEATER VENT TO BE EXTENDED TO 3' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' WITH DOUBLE WALL VENT PIPING. |
|
| 02/19/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. EXPOSE THE AREA THAT WAS REPAIRED FOR INSPECTION BE SURE IT IS PROPERLY PRIMED THEN TAPED AT ALL TOOL MARKS AND FITTINGS BELOW GROUND TO 6" ABOVE GROUND. 2. TEST TO BE IN PLACE ON ENTIRE GAS SYSTEM MINIMUM 10 PSI WITH NO LOSS FOR 15 MINUTES 3. NEED ACCESS TO ENTIRE GAS SYSTEM FOR INSPECTION LIST MAY NOT BE COMPLETE |