Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T08PL00228
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/12/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* GAS CARD AT METER SW GAS 889-1888 |
|
02/11/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* READ & COMPLY WITH ALL NOTES FROM 2/8/08 INSPECTION NOTE: WATER HEATER VENT IS REQUIRED TO TERMINATE MINIMUM 3' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF INTAKE. SUPPORT ALL PIPING PROPERLY. |
|
02/08/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. VENT FOR WATER HEATER TO BE INSTALLED IN CORRECT DIRECTION OF FLOW 2. SUPPORT GAS PIPING AT CORRECT INTERVALS AND AT CHANGES OF DIRECTION 3. PROVIDE SEDIMENT TRAPS AT GAS ENTRY TO WATER HEATER AND FURNACE 4. PROVIDE BONDING OF BUILDING GAS PIPING 5. GAS PIPING TO HOLD TEST FOR 15 MINUTES WITH NO LOSS OF PRESSURE 6. PROVIDE AGA OR CSA APPROVED GAS VALVES FOR ALL APPLIANCES 7. GAS PIPING SYSTEM IS UNDERSIZED FOR BTU DEMAND AND DISTANCE OF PIPING RUNS. |