Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 02/05/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. TEST TO HOLD FOR 15 MINUTES WITH NO LOSS OF PRESSURE 2. PROVIDE RIDGID NIPPLE THRU FURNACE APPLIANCE HOUSING 3. PROVIDE SHUT OFF APPROVED GAS VALVE AT BUILDING ENTRANCE 4. PROVIDE CORRECT TEE AT FURNACE/WATER HEATER 5. REMOVE TAPE AT SINGLE TO DOUBLE WALL CONNECTOR AND PROVIDE 3-GALV SCREWS ON VENT CONNECTION 6. PROVIDE BONDING OF BUILDING GAS SYSTEM 7. SHADE PIPING TO PROVIDE SOLID BEDDING |