Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T08PL00222
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/01/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
07/30/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* TEST IS OK PETITION OF APPEAL ON SITE #144-08 1. PROVIDE BONDING OF BUILDING GAS PIPING 2. MAKE UP VENT FOR FURNACE AT SINGLE TO DOUBLE WALL CONNECTION AND PROVIDE APPROVED FASTENERS 3. INSTALL 125# PRESSURE RELIEF AT HOSE BIB LOCATION WITH NIPPLE WITH NO THREADS ON DISCHARGE END. |
|
04/25/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* THIS IS A PARTIAL REPIPE WATER HEATER WAS INSTALLED WITHOUT INSPECTION 1. PROVIDE CORRECT VENT CONNECTION FOR WATER HEATER, REMOVE ALL TAPE & PROVIDE APPROVED VENT FASTENERS AT ALL JOINTS AT BOTH WATER HEATER & FURNACE 2. PROVIDE AN APPROVED WATER FLEX CONNECTOR FOR WATER HEATER 3. PROVIDE SEDIMENT TRAPS AT GAS ENTRY TO WATER HEATER AND FURNACE 4. PROVIDE TEMPERATURE & PRESSURE RELIEF DRAIN FROM WATER HEATER GRAVITY DRAIN TO DAYLIGHT WITH 90 DEG. DOWN AT TERMINATION 6"-24" FROM FINISH GRADE 5. PROVIDE BONDING OF BUILDING GAS SYSTEM |
|
04/01/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. NOBODY HOME 2. CONTINUED "NOT READY" MAY RESULT IN A REINSPECTION FEE |
|
02/22/2008 | PLUMBING - FINAL | Cancelled | CANCELLED PER APPLICANT CARRIE BAKER #663-7842 |