Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: SEWER - PRE CONSTRUCTION MTG
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2008 | SEWER - PRE CONSTRUCTION MTG | Not ready for Inspection | IVRS - Inspection :* 1) SCHEDULE THE PRE-CON WHEN THE EINGINEER CAN BE PRESENT |
|
| 02/05/2008 | SEWER - PRE CONSTRUCTION MTG | Approved | IVRS - Inspection : 1. PRE-CON MEETING 12 NOON 2. 8" SDR 35 FROM MANHOLE #1 TO MANHOLE #2 INSTALLED WITH TRACER 3. 6" SDR 35 FROM MANHOLE #2 PLUS OR MINUS 40' WITH TRACER 4. 4" SDR 35 BRANCH FROM MANHOLE #2 TO DEAD END TRACER INCLUDED 5. OK TO COVER SUBJECT TO VERIFICATION OF GRADE AND TESTING AT A LATER DATE 6. READY TO POUR BASES - RECALL 03057 AND LEAVE MESSAGE |