Inspection History Details
Inspection Status: Approved
Inspection History: SITE - SEWER
Permit Number - T08PL00191
Inspection Description - SITE - SEWER
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/24/2008 | SITE - SEWER | Approved | IVRS - Inspection :* | |
10/16/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* LOW PRESSURE AIR TEST TODAY MIRROR AND MANDRILL TO FOLLOW ALL TESTING VERIFIED BY STEVE WITH WLB |
|
10/14/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1. RETEST 2 MANHOLES 2. CONTINUE TESTING MANHOLES |
|
10/13/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* WLB VACUUM TESTING MANHOLES TODAY |
|
10/10/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) MTG: LEDCOR, WLB, EAGLE ROCK & CITY OF TUCSON 2) MTG TO DETERMAIN BEST POSSIBLE SOLUTION TO WORK INSTALLED W/O INSPECTION 3) CALL 03057 WHEN TESTING BEGINS. I WILL VERIFY MATERIAL TYPES AND TERMINATION POINTS AS INSTALLED BY CONTRACTOR |
|
10/10/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 6" FROM MH#13 EAST 5" W/6" C.O. 103-A C.O S-105 TO S106 WITH TWO RISERS S-213 & S-214 (CHEESECAKE FACTORY) S-200 TO S221 TO S222 |
|
10/08/2008 | SITE - SEWER | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. CONTRACTOR HAS NOT CALLED IN TIMELY INSPECTIONS 2. SUB-CONTRACTOR HAS GIVEN INSPECTOR ERRONEOUS INFORMATION 3. SEWER HAS BEEN COVERED WITHOUT INSPECTION |
|
05/07/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* NEED TO SEE 207-208 |
|
05/05/2008 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* | |
04/18/2008 | SITE - SEWER | Partial Approval | 206 & 207 OK TO COVER STACKED 4 MANHOLES |
|
04/17/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 203-205 OK TO HAVE BASES POURED |
|
04/15/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* S202-S203 OK TO COVER |
|
04/14/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* BASES POURED TODAY (3) |
|
04/10/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 20' OF D.I.P EXTENDED FROM MANHOLE |
|
04/03/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* S-200 TO S-210 OK TO COVER SUBJECT TO VERIFICATION OF GRADE |
|
04/02/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* BASED BEING POURED TODAY |
|
04/01/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* S-101 TO S-102 INSTALLED S-102 TO S-103 INSTALLED OK TO COVER SUBJECT TO VERIFICATION OF GRADE AND TEST AT A LATER DATE. CALL FOR BASES TOMORROW AM |
|
03/31/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* CALL FOR MID-MORNING INSPECTION TOMORROW |
|
03/28/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* S-100 TO S-101 INSTALLED WITH TRACER OK TO COVER SUBJECT TO VERIFICATION OF GRADE AND TEST AT A LATER DATE |
|
03/27/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* PLUS OR MINUS 83' OF 8" SDR35 INSTALLED CONTRACTOR IS DRAGGING A BOX SO IS LAYING AND COVERING AS HE GOES. OK TO COVER, SUBJECT TO VERIFICATION OF GRADE AND TEST AT A LATER DATE |
|
03/26/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* EXCAVATION CONTRACTOR STARTING AT S-100 8" SDR35 EXISTING 8" A/C SEWER EXPOSED FOR NEW MANHOLE CONTRACTOR SETTING HIS BOX, AND WILL LAY, TRACE, AND COVER AS HE GOES |