Inspection History Details
Inspection Status: Partial Approval
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/01/2008 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* | |
| 01/29/2008 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* TEST FROM NEW METER LOCATION TO WATER HEATER & NEW FURNACE/AC UNIT OK 1. AC CONTRACTOR TO OBTAIN PERMIT AND PASS INSPECTION 2. VENTS FROM WATER HEATER & FURNACE TO BE EXTENDED WITH DOUBLE WALL VENT PIPING 3' ABOVE COMBUSTION AIR INTAKES 3. PROVIDE BONDING OF BUILDING GAS PIPING 4. PROVIDE DRIP LEG AT FURNACE GAS ENTRY AND WATER HEATER GAS ENTRY TO APPLIANCE. |