Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2008 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 02/08/2008 | PLUMBING - GAS PRESSURE TEST | Cancelled | IVRS - RI canceled | |
| 02/05/2008 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* NOBODY HOME CONTRACTOR TO PAY REINSPECTION FEE |
|
| 01/30/2008 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. I CALLED 440-4212 TWICE AND LEFT MESSAGES 2. NOBODY HOME CONTINUED "NOT READY" WILL RESULT IN A REINSPECTION FEE |
|
| 01/28/2008 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* PRESSURE TEST OK 1. CORRECT SLOPE ON VENT CONNECTOR 2. TYPE B REQUIRED ABOVE ROOF 3. PIPE T&P TO EXTERIOR W/MATERIALS ALLOWED FOR HOT WATER USE 4. SUPPORT GAS PIPING W/NEW WEATHER RESISTANT PIPE SUPPORTS. FIRST SUPPORT SHALL BE WITHIN 1' OF ROOF PENETRATION 5. SEDIMENT TRAP REQUIRED AT FURNACE REGULATOR 6. SEAL WALL PENETRATIONS |