Inspection History Details
Inspection Status: Partial Approval
Inspection History: SITE - SEWER
Permit Number - T08PL00157
Inspection Description - SITE - SEWER
Inspection Status - Partial Approval
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/10/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* CORRECTION OK |
|
11/05/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* MARTIN W/BAKER & ASSOC. PRESENT FOR TESTING. VACUUM TESTING COMPLETE PRESSURE TESTING OK, EXCEPT FOR RETEST REQUIRED AT CORRECTION BETWEEN #2 AND #6. RECALL FOR INSPECTION AND PROVIDE PCDEQ AUTHORIZATION TO DISCHARGE FOR FINAL APPROVAL. |
|
10/30/2008 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* CHIN-CHIN (909-3381) |
|
10/23/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* MET WITH CONTRACTOR WENT OVER TESTING |
|
10/09/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) DUCTILE IRON BETWEEN MHS 4 AND 5 OK 2) DUCTILE IRON BETWEEN MHS 3 AND 4 OK 3) NOTE: TAPING THE SIDE OF A PIPE IS NOT ACCEPTABLE. TAPE MUST BE AT A 45 DEGREE ANGLE |
|
10/08/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* - FROM MANHOLE #6 TO #7 WITH 20'4" HCS TOWARD LOT #11 FROM MANHOLE #7 - FROM MANHOLE #3 8" SP-2000 DUCTILE IRON APP. 140' PLEASE NOTE DETAIL #3 SHEET 3 OF 3 |
|
10/07/2008 | SITE - SEWER | Partial Approval | IVRS - Inspection :* USE IVR SYSTEM TO SCHEDULE INSPECTIONS FROM MH#1 TO #2, FROM #2 TO #3 AND FROM #2 TO #6 OK WILL TEST LATER, AFTER TAPPING AND INSTALLING HCS CONNECTIONS. OK TO COVER AFTER 3RD PARTY VERIFICATION OF GRADE AND ENGINEER INSPECTION. |