Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS RECONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/08/2008 | PLUMBING - GAS RECONNECT | Approved | IVRS - Inspection :* | |
| 01/23/2008 | PLUMBING - GAS RECONNECT | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE TEST ON ENTIRE GAS SYSTEM MINIMUM 10 PSI WITH TEST GAUGE IN 1/10 POUND INCREMENTS TO HOLD WITH NO PRESSURE LOSS FOR 15 MINUTES AT TIME OF INSPECTION. 2. PROVIDE AGA OR CSA APPROVED GAS VALVE AT FURNACE LOCATION AND ALL APPLIANCE LOCATIONS 3. PROVIDE PROOF OF NEW FURNACE INSPECTION OR PROVIDE PERMIT & HAVE FURNACE INSPECTION. NOTE: VENT TO BE INSTALLED CORRECTLY WITH APPROVED MATERIALS AND VENT CAP. PROVIDE RIDGID NIPPLE THRU APPLIANCE HOUSING AND SEAL COMPARTMENT SEPARATION FOR COMBUSTION CHAMBER & RETURN AIR PLENUM. PROVIDE LADDER ACCESS TO ATTIC SPACE. 4. PROVIDE UPPER COMBUSTION AIR FOR WATER HEATER |